Below are some key projects, more can be seen in our Gallery.

 

HATFIELD EAST & WEST SHOWROOM

Hatfield east garage and showrooms for Lamborghini and Bentley. 236 tonnes of hot rolled steel and 30 tonnes of cold rolled steel installed.

HAMPTON, BY HILTON

Installation of 300 tonnes of hot rolled steel (1800 steel members), pre cast stairs, metal deck and cold rolled steel. 

BURNLEY FOOTBALL CLUB

Installation of steelwork, metal deck, stairs, handrailing, etc to two additional stands at Burnley Football Club. The job contained around 250 tonnes of hot rolled steel.

KETLER WAREHOUSE

120 tonnes of hot rolled steel and 20 tonnes of cold rolled. Steelwork installed in 2 weeks.

UNITS 6-8, SOUTH KIRBY

Installation of 60 tonnes of hot rolled steel and 10 tonnes of cold rolled steel. Steelwork installed in 2 weeks.

MARSH BARTON, EXETER

Installation of two portal sheds totalling 180t of hot rolled and 33t of cold rolled steel along with alterations to an existing building onsite. Total duration of 6 weeks onsite including site works to existing.

TEAL PARK, NOTTINGHAM

Installation of 2 portal sheds totalling 130t of hot rolled and 35t of cold rolled steelwork. 4 weeks onsite.

UNI SUB STATION, YORK

Installation of 40 tonnes of hot rolled steel installed in 1 week.

VICTORIA RIVERSIDE MILLS E&F, LEEDS

Block E - part new build connecting over the top of the existing mill building, adding new floors as well for living apartments. 221 tonnes of hot rolled steel and 2 tonnes of cold roll steel installed. 

 

Block F - 2 new floors over the top of existing mill building connecting to new building. 61 tonnes of hot rolled steel and 3.6 tonnes of cold rolled steel installed.

PRODUCTION PARK, SOUTH KIRBY

Installation of a portal shed to provide live music practice space. 80t of hot rolled and 10t of cold rolled steelwork with 2 weeks onsite.